Skip to main content

prhp/PA16/159/11/var1

Our Ref
prhp/PA16/159/11/var1
Street Name
Main Street
Town
inverkip
Post Code
PA16 0AS
Type of Order
RSEO variation
Repair Category
13(1)(a), 13(1)(b), 13(1)(c), 13(1)(d), 13(1)(e), 13(1)(f)
Decision Date
Members Names
J Taylor, M Links, J Riach
Details
Therefore the said Repairing Standard Enforcement Order is hereby VARIED with effect from the date of service of this Notice such that the following items are deleted from the Order:-(1) Eradicate the dampness/ water ingress in the cupboard of the back bedroom.(2) Repair and renew, where necessary (a) the gulter on the rear external wall of the kitchen extension (b) the connection between the kitchen waste pipe and the grilling below and (c) the connection between the bathroom waste pipe on the rear external wall of the Property and the over sized collar below to render them in proper working order.(3) Effect repairs to render the plumbing to the sink in the upstairs bathroom in proper working order. Further the said Repairing Standard Enforcement Order is hereby VARIED with effect from the date of service of this Notice in respect of the following outstanding works:-(1) Eradicate the dampness/ water ingress in the living room wall, the flooring underneath the washing machine/sink and dishwasher and the kitchen wall and carry out necessary redecoration.(2) Repair and renew the following electrical items and render the said items in proper working order such that they comply with the current electrical standards:-2.1 Repair and relocate the broken main light SWitch in the downstairs bathroom such that it is located out with the bathroom. ,2.2 Remove the double socket within the downstairs bathroom. ,2.3 The light switches in the Property. , 2.4 The broken double socket and light switch in the back bedroom. , 2.5 The ceiling light fitment in the front bedroom. ,2.6 The wiring in the Property.(3) Effect repairs to render the WC in the upstairs bathroom in proper working order.(4) Repair or replace the boiler to render it in proper working order.The period allowed for the completion of the said outstanding works is extended to 25th May 2012.

File:

Document
var.159.11_(rdt)_0.pdf (466.04 KB)