Skip to main content

prhp/KY8/9/09/RSEO

Our Ref
prhp/KY8/9/09/RSEO
Street Name
Wellesley Road
Town
Methil
Post Code
KY8 4NB
Type of Order
RSEO
Repair Category
13(1)(a), 13(1)(b), 13(1)(c), 13(1)(f)
Decision Date
Members Names
A Devanny, I Mowatt, J Wolstencroft
Details
In particular the Private Rented Housing Committee requires the Landlord:-(a) to produce a Gas Safety Certificate for the house to Private Rented Housing Panel to confirm that the installation for the supply of gas is in a reasonable state of repair and in proper working order,(b) to carry out such repairs as are necessary to the gutters, roof slates, flashing and roughcasting to ensure that the house is wind and watertight and the structure and exterior of the house are in a reasonable state of repair,(c) to replace the two kitchen windows and the sitting-room window and to carry out such other repairs as are necessary to the remaining windows to ensure that all windows are in a reasonable state of repair and proper working order ,(d) to replace the floor covering in the kitchen to ensure that it is capable of being used safely,(e) to carry out repairs to the external door to ensure that it is in a resonable state of repair, in proper working order and the house is wind and water tight,(t) to ensure that the communal yard is made tidy so that it is in a reasonable state of repair,(g) to carry out such repairs as are necessary to the internal doors to ensure that they are in a reasonable state of repair and in proper working order,(h) to remove the wardrobe in the bedroom or to repair the wardrobe to ensure that it is in a reasonable state of repair and proper working order, and(i) to carry out such works to the property as are necessary to comply with Section 13(1)(f) of the Housing (Scotland) Act 2006 by the installation of a satisfactory provision for detecting fires and for giving warning in the event of fire or suspected fire. The provisions of section 13(5) of the said Act must be regarded in relation to the said installation.The Private Rented Housing Committee order that the works specified in this Order must be carried out and completed within the period of 56 days from t

File:

Document
rseo.9.09_0.pdf (666.29 KB)