Skip to main content

prhp/IV44/78/10/RSEO

Our Ref
prhp/IV44/78/10/RSEO
Street Name
Teangue, Sleat
Town
Isle of Skye
Post Code
IV44 8RE
Type of Order
RSEO
Repair Category
13(1)(a), 13(1)(b), 13(1)(c), 13(1)(e)
Decision Date
Members Names
E Miller, R Buchan
Details
In particular the Private Rented Housing Committee requires the landlord:-(a) To repair or replace as appropriate the Rayburn in the kitchen within the Property and to ensure that it is connected properly back into the hot water system and to ensure it is in proper working order(b) To repair or replace the windows and skylights within the Property and ensure that they are properly wind and watertight and capable of being open, shut and lockable with the snib in a normal fashion. Following repair or replacement of the windows, redecoration of the paintwork must also be carried out.(c) To repair or replace the broken floorboard in the upstairs spare bedroom.(d) To repair or replace the rainwater disposal system at the Property to ensure that it is in proper working order and free of leaks.(e) To carry out such works as are necessary to fix the leaks coming from the tap and drain at the kitchen sink and to make good any damage occasioned by the said leaks to the kitchen unit surrounding.(f) To repair or replace the front door lock.(g) To repair or replace the two metal edging strips that are currently loose within the Property and carry out any redecoration works required as a result.(h) To attend to the general drainage or carry out such other works as are necessary to the ground surrounding the Property to ensure safe access to and egress from the rear door to the drivewayThe Private Rented Housing Committee order that the works specified in this Order must be carried out and completed within the period of 12 weeks from the date of service of this Notice.

File:

Document
rseo.78.10_0.pdf (483.85 KB)