In particular the Private Rented Housing Committee requires the Landlord:-(a) to carry out such works as are necessary for the area of ground underneath the kitchen window to be made good and level ,(b) to ensure that the drain at the rear of the lean-to extension functions properly and drains all water leading from the downpipe ,(c) to repair or replace the rear external door and to repair or replace the surrounding frame and threshold and to ensure that the door is wind and watertight ,(d) to repair or replace all external windows within the Property to ensure that they are wind and watertight and further to ensure that all windows are capable of properly opening and closing and that all holes surrounding the frames are made good ,(e) to repair or replace the internal door leading from the lean-to extension and to repair or replace the frame surrounding the door and to ensure it is affixed properly to the surrounding wall(f) to properly complete the boundary wall adjacent to the rear gate and to ensure that it is in a proper state of repair , (g) to properly line the dining room chimney ,(h) to properly reinstate the kitchen and carry out all finishing off and decorating works ,(i) to replace the broken floorboard at the entrance to the northwest back bedroom ,(j) to install a proper mains operated fire detection system,The Private Rented Housing Committee order that the works specified in this Order must be carried out and completed within the period of 3 months from the date of service of this Notice.
File: