In particular the Private Rented Housing Committee requires the landlord:-(a) To repair the connection between the stove and flue in the downstairs spare room of the Property and thereafter to carry out such other works as are necessary to allow the Landlord to produce a report from a reputable heating engineer confirming that the stove is in proper working order and capable of being used safely by the Tenant.(b) To have the said heating engineer confirm whether or not an electrical pump requires to be added to the back boiler in the main living room of the Property to ensure it is in proper working order and, if so required by the recommendation of the said heating engineer, to install an appropriate standard and type of pump.(c) To remedy any defects to the electrical system within the Property sufficient to allow the issue of a domestic installation periodic inspection report from a suitably qualified electrician confirming that the system is in satisfactory condition.(d) To seal the gaps within the flagstones in the Property with an appropriate sealant.The Private Rented Housing Committee order that the works specified in this Order must be carried out and completed within the period of 28 days from the date of service of this Notice.
File: